Meaning
Fill time is how long the screw takes to fill the cavity in the speed-controlled phase, before the press switches to pressure control. It is chosen against how fast the resin freezes. Too slow and the melt starts to solidify before the cavity is full. Too fast for the gate and the melt is oversheared.Typical Range
DuPont’s nylon guide calls 1 to 3 seconds a fast fill and wants it in thin sections. Thick sections take a slower fill. Glass-reinforced and other nucleated nylons freeze sooner and need the faster end. The Zytel 70G33HS1L window lists 1 to 3 seconds, slower for thick sections.Read More
Effect on Surface
A quick fill gives a better surface on nucleated, glass-reinforced nylon. A slow fill leaves frosting, which is often mistaken for bad fiber dispersion or wet resin. DuPont’s advice is to change fill speed alone and look at the surface before touching the dryer or the screw.End of Flow
For burning at the end of flow, DuPont proposes a two-stage fill. The cavity fills fast through most of its length and slower near the end. The slower last stage gives the vents more time, but it does not replace vents.Transfer Point
Fill ends at the transfer position, as late as the process allows and never after the cavity is full. Switching earlier leaves the hold phase to finish filling at low speed. Switching later drives pressure into a full cavity and leaves a stressed zone near the gate.Record
A first article records the fill time with the melt temperature, mold temperature and transfer position.