Meaning
First samples are the first parts molded from a new tool, measured to learn the part’s real shrinkage and to correct the cavity before approval. They carry what no datasheet or standard can, the shrinkage of this part in each direction with its gate and its pressure. A tolerance written before them is a hope. One confirmed on them is a specification.Sequence
The toolmaker first states the allowance in each direction and the datasheet value behind it. The first samples are molded at the agreed conditions, with the hold time on the part weight plateau. They are measured at the agreed temperature after a stated time, and nylon in its stated moisture state. The report is compared with the drawing, and the cavity is corrected where the allowance missed. A second sample proves the correction and then serves as the run’s reference.Read More
Error Types
One first-sample report can show three kinds of error at once. A wrong allowance is systematic and is corrected in the cavity. Process drift is random and is held on the press. An orientation effect is a shape error owned by gate position and glass content. A buyer who sees all three knows which belongs to the toolmaker, the molder and the designer.Measurement Risk
The first sample sets the reference for every later part, so an error in its measurement is copied into the whole run. A sample read 10 °C warm makes the shrinkage look smaller than it is. The cavity corrected on that reading ends up too small. The first-sample report therefore records the temperature, the moisture state, the time after molding and the method beside each value.Finish
How much a molded surface copies from a polished cavity is settled on the first samples, not on the sheet. For acetal, a buyer reviewing first samples asks for the part weight check against packing time. That plot is the evidence that the process was set before the cavity was touched.